Usually yes. New electrical work, service changes and EV chargers generally need a permit in the Orlando area, and each city sets its own rules. Small jobs are where cities differ most: Winter Garden wants a permit for a new outlet or fan, while Winter Park exempts replacing a fixture. Your licensed electrician normally pulls it.
What does each Orlando-area city say about electrical permits?
Each city runs its own building department, so a job can be simple in one and paperwork in the next. Here is what each one publishes.
| City | What the city says |
|---|---|
| Orlando | An EV charging station needs an electrical permit with an associated engineering permit, issued to a licensed contractor, plus signed and sealed plans |
| Winter Park | Installing, altering or replacing an electrical system needs a permit. Replacing electrical fixtures does not |
| Kissimmee | Meter or panel change-outs and sub panels are listed under electrical permits |
| Altamonte Springs | The trades permit form has an electrical scope and asks for a recorded Notice of Commencement on work over $5,000 |
| Sanford | Permits are generally required for new construction, remodels, repairs and additions. Call 407-688-5051 on electrical specifics |
| Lake Mary | The fee page has a service-change line. Your electrician confirms which jobs need a permit |
| Apopka | Electrical permits are required for all electrical work, including new service equipment and service increases |
| Ocoee | Building permits cover work including electrical systems |
| Winter Garden | A permit comes first for any new or added electrical work, including a new outlet, fan or fixture |
| Maitland | Like-for-like panel and meter box change-outs are on the streamlined permit list |
What does an electrical permit cost around Orlando?
Anywhere from a flat fee to a percentage of the job, depending on the city. These are the published figures. On a panel upgrade or EV charger, the typical price here already includes the standard electrical permit. Orlando's EV plans and engineering permit are quoted separately.
- Winter Park: the fee schedule lists a residential sub-permit fee at $75; other fees may apply.
- Orlando: the 2026 residential schedule lists Change of Service at $50 and an electrical permit fee from $66.24 for the first $1,000 of cost. Your electrician confirms which line fits a panel swap.
- Lake Mary: service changes cost 0.75% of the documented value, with a $35 minimum.
- Maitland: the fee page lists residential stand-alone electrical alterations at $275, and marked stand-alone permits add a $100 processing fee. Your electrician confirms which line fits a panel change.
For other cities, ask the building department. Winter Garden says fees usually follow the project's value.
What happens if electrical work was done without a permit?
It usually costs more, and it can follow you. Winter Garden and Winter Park both charge triple for an after-the-fact permit. Unpermitted work can also come up when you sell the house, so doing it right the first time is the cheap option.
Who pulls the electrical permit?
On most jobs, the licensed electrical contractor does. Orlando's EV charging permit, for one, is issued to a licensed general or electrical contractor. If someone asks you to pull it in your own name, slow down and check their license.
What other paperwork can a bigger job need?
A Notice of Commencement, on jobs above a set value. Orlando and Altamonte Springs both use a $5,000 line. Your electrician can tell you whether your job crosses it.
Want it handled? See your typical price and get a licensed electrician, who pulls the permit.
Common questions
Do I need a permit for a new outlet, ceiling fan or light fixture?
Cities differ. Winter Garden says an electrical permit comes before any new or added electrical work. Winter Park lists replacing electrical fixtures as not needing one.
How much will my permit cost?
It varies by city and job, and often follows the value of the work. The typical prices for panel upgrades and EV chargers on this site include the permit.
What if I skip the permit?
In Winter Garden, the building official issues a notice, an after-the-fact permit costs triple, and ignoring it can lead to a Notice of Violation and fines.
Do I need a contractor, or can I pull my own permit?
Some owners can, under limits. Winter Garden describes an owner-builder route for certain one- and two-family homes the owner lives in, and warns that an unlicensed contractor asking you to pull your own permit may be a red flag.